LATEST NEWS
November 29, 2012
Manitoba releases 2013 tendering schedule
WINNIPEG
The province of Manitoba has released its 2013 construction tendering schedule, continuing its 10-year commitment to upgrading infrastructure across the province.
“We have completed many of the major repairs of roads and bridges damaged in last year’s flood and have made record investments in our roads and bridges, but we know there is more to do,” said infrastructure and transportation minister Steve Ashton.
During the 2013 construction season, the province will upgrade and repair more than 40 bridges in addition to a major emphasis on continuing to renew Manitoba’s core highway network with more than 1,160 kilometres scheduled for upgrades.
Near Winnipeg, those projects include: starting a multi-year project to upgrade the Perimeter Highway near Brady Road; rehabilitating the overpass on the Perimeter Highway at PTH 75; and rehabilitating the overpass structure on the Perimeter Highway at the Trans-Canada Highway East.
In Southern Manitoba, projects include: repaving the westbound lanes and shoulders on the Trans-Canada Highway from Portage la Prairie to PTH16; adding turning lanes and safety features to the intersection of PTH 3 and PTH 23; starting a multi-year project to significantly improve PTH 13 from Carman to Elm Creek; completing paving to PTH 16 from Binscarth to east of Foxwarren; and shoulder widening of the eastbound lanes of the Trans-Canada Highway from the Brokenhead River to east of the Trans-Canada Highway.
In Northern Manitoba the government will: continue major work to upgrading PR 373 north of Jenpeg; continue upgrading PR 280 in conjunction with Manitoba Hydro; widen the shoulder of PTH 6 north of Sasagiu Rapid; and pave PTH 10 south of PTH 60 to Overflowing River.
In Central Manitoba, projects include: starting a multi-year project involving intersection improvements and paving of PTH 59 from Brokenhead Ojibway First Nation to PTH 11; paving PTH 9 from PTH 4 to north of Clandeboye; intersection improvements on PTH 6 at Woodlands; and starting the next section of a multi-year project of grade widening, base work and paving of PTH 10 from PTH 25 to PTH 24.
Bridge projects include replacing the bridge on PR 227 over the Assiniboine River north of Portage la Prairie that was damaged during the 2011 flood; and major repairs to the bridge on PTH 23 over the Red River near Morris.
The province will also cost-share two major projects with the federal government, scheduled for summer 2013. Those projects are the completion of CentrePort Canada Way, a new roadway connecting CentrePoint to the national and international highway system; and intersection reconstruction of the Trans-Canada Highway through Headingley.
The proposed schedule for the 2013 construction season is being issued now so contractors can prepare to bid on projects for the next construction season. The document is available at www.gov.mb.ca/mit/contracts/index.html.
DCN NEWS SERVICES
| MOST POPULAR STORIES |
- Concrete parking building repairs could save costs
- New Pickering airport to help move growing population
- Man fined in construction site death of 12 year old Nova Scotia boy
- SNC-Lavalin hopes Algeria police raid will help to shed light on wrong
- New venue in St. Catharines to be the city’s first Gold-Seal project
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 544 projects with a total value of $1,665,691,502 that Reed Construction Data Building Reports reported on Tuesday.
$44,000,000 Sault Ste Marie ON Tenders
CONDOMINIUM APARTMENT TOWER, RETAIL BUILDING
$40,000,000 Toronto ON Negotiated
RESIDENTIAL DEVELOPMENT, GOLF CLUB
$35,000,000 Newmarket ON Prebid
| CURRENT STORIES |
- Infrastructure funding will boost economy: RCCAO
- Plant, Prep and Serve
- McManus to increase interaction in new OSWCA role
- Trade infrastructure funding study could grow economy
- U.S. housing starts remain on the upswing after strong May
- First set of arches installed on precast network arch bridge
- Toronto and Hamilton area roads make up half of CAA's worst roads list
- Crystal Clear
- Regina looking to annex adjacent land
- Pipeline oil spill highlighted during twinning debate
- Consulting engineers gathering in Lake Louise, Alberta
- Biased specs grounds for RFP redraft
- Incoming chair looks to the future
- Foreign worker court case led to reforms
- Shell Canada gets approvals for pipelines and gas well
- B.C. building permits rise, but Alberta declines
- Electronic migration
- Unauthorized water system shut down in Alberta
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- An Overview of Prices and Sales in the Diverging U.S. and Canadian Housing Markets (April 25, 2013)
- Canada’s Precarious Dependence on the Commodity Price Super-Cycle (April 22, 2013)
- Twenty major upcoming residential and transportation terminal construction projects - April 2013 (April 15, 2013)
- More








