Bid Protest Bulletin | Paul Emanuelli
Municipal “clarifications” constitute bid repair
In its May 2008 decision in Maystar General Contractors Inc. v. Newmarket (Town), the Ontario Superior Court of Justice found that the municipality improperly corrected a mathematical error in a tender and held the municipality liable for awarding a contract to a non-compliant bidder.
The case involved a tender call for the construction of a recreational facility. The plaintiff, Maystar General Contractors, was an unsuccessful bidder. It alleged that the contract was awarded to a non-compliant competing bidder. It sued for $3.3 million in lost profits. Newmarket, the defendant municipality, argued that the selected tender was compliant and that its mathematical corrections were permitted within the tendering rules. The court disagreed, finding that the bid price in the selected tender was uncertain and that the post-bid “clarifications” and “corrections” amounted to improper bid repair.
As the court explained, the inconsistent pricing information in the selected tender was capable of two different interpretations, thereby leading to uncertainty with respect to the tendered price:
Bid Protest Bulletin
Paul Emanuelli
In my view, Bondfield’s price as contained in its bid was uncertain. Given that Bondfield made two errors, one in respect of the GST amount and the other in respect of the total price, it was not possible from reviewing Bondfield’s Bid Form to tell where its error lay. On the one hand, if the Stipulated Price which Bondfield submitted ($33,000,528.00) was the correct price at which it was prepared to do the work then the 7 per cent GST would equal $2,310,036.96 (not $2,346,960.00 as submitted) and the total price would be $35,310,564.96 (not $35,874,960.00 as submitted). On the other hand, if the GST and the total price sums submitted by Bondfield were correct, then the stipulated price would have been $35,528,000.00, not $33,000,528.00 as submitted. The result, therefore, of Bondfield’s error is that it is not possible to determine whether its Stipulated Price was $33,000,528.00 or $33,528,000.00. Accordingly, the price as submitted by Bondfield in its bid was uncertain.
This failure to submit a clear offer on price was a material mistake that rendered the bid non-compliant and incapable of acceptance. The court determined that this type of mistake could not be properly cured by a post-bid “correction” or “clarification” and that the municipality’s post-bid rectification amounted to bid repair.
In September 2009 the Ontario Court of Appeal upheld this decision, noting that the lower court had correctly concluded that the error in the pricing information was a material mistake that could not be fairly corrected after the submission of bids:
The appellant submits that the application judge erred by treating a price discrepancy as an automatic non-compliant bid and that the discrepancy in the presentation of the price figures by Bondfield in its bid did not materially affect the price itself, and gave Bondfield no unfair advantage within the tender process.
There is no merit in this submission...[T]he reason the price was materially affected in this case...was because there was uncertainty as to which price was the intended bid price until the correction was made. That after the fact correction gave Bondfield an unfair advantage over other bidders and was not compliant with the terms of the tender documents.
The Court of Appeal therefore dismissed the appeal and ordered costs against the appellant. As this case illustrates, purchasers are constrained in the post-bid indulgences that they can grant bidders who make mistakes in their tender submissions. Since permitting post-bid corrections to defective bids can constitute improper bid repair, purchasers who grant such indulgences do so at their peril.
This article is extracted from his Government Procurement textbook published by LexisNexis Butterworths. Reach Paul at paul.emanuelli@procurementoffice.ca.
| MOST POPULAR STORIES |
- OPG $1 billion proposal to bury nuclear waste up for comment
- Hundreds of workers to be out of work as Caterpillar Inc. is set to close Toronto factory
- Proposed Ambassador Bridge twinning draws Windsor mayor’s ire
- Construction on pedestrian tunnel to Billy Bishop Airport continues to make progress
- Ontario prompt payment bill to get second reading today
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 316 projects with a total value of $2,787,806,637 that Reed Construction Data Building Reports reported on Friday.
SENIORS CONDOMINIUM APARTMENT & OFFICE BLDG
$90,000,000 Richmond Hill ON Prebid
$82,000,000 White River Twp ON Tenders
CONDOMINIUM APARTMENT BUILDING
$40,650,000 Markham ON Prebid
| CURRENT STORIES |
- VIDEO: Economic Update May 21, 2013
- VIDEO: Competing in the trades
- Multi-employer approach needed in apprenticeships
- New Perspective
- ACEC’s input helps develop global engineering guidelines
- Clerk of works position gives peace of mind on projects
- World Trade Center developer’s plan for a 926-foot tower moving ahead
- Call for action after MOL says workers are responsible for their own safety
- Cold spring and weak construction hurt Deere’s 2013 predictions
- CanBIM reschedule June session
- More green roofs top Toronto buildings
- Witness recants testimony in Montreal corruption case
- Construction Site Arson
- Journal of Commerce Update for the week of May 20th, 2013
- Industry reacts to surprise B.C. Liberal majority
- Calgary Airport Tunnel
- Worker at centre of union sign up allegations speaks out
- Calgary program aims to get more people into the trades
- Midrise in the City
- Veterans battle barriers into the trades
- Government makes changes to online tendering
- SNC-Lavalin maintains that new bribery allegations have been resolved
- B.C. faces a tough battle for top talent
- Keyano College building state of the art training facility
- Essential skills can play a vital role in an apprentices' success
- Taking a closer look at the risks in green building for contractors
- Colleges conduct construction research in addition to teaching
- Skills Canada BC Competition
- Lower Mainland high school trades program is unique
- Construction Learning Forum aims to educate
- High schools looking for more industry participation
- Industrial construction supervisor program takes off
- Saskatchewan bill passed
- Edmonton garners support for regional cash for arena
- Feds pledge $5 million for Vimy memorial
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- An Overview of Prices and Sales in the Diverging U.S. and Canadian Housing Markets (April 25, 2013)
- Canada’s Precarious Dependence on the Commodity Price Super-Cycle (April 22, 2013)
- Twenty major upcoming residential and transportation terminal construction projects - April 2013 (April 15, 2013)
- More