LATEST NEWS
July 7, 2008
Burk’s Falls and Parry Sound receive funds for water, sewer improvements
BURK’S FALLS
The federal government is prepared to provide $275,880 in infrastructure funding for improvements to the water distribution system in the Village of Burk’s Falls.
The federal contribution would be up to one-third of total eligible costs, which are estimated at $827,641.
“Thanks to the federal government, we will be able to proceed with these necessary system upgrades,” said Cathy Still, Reeve of the Village of Burk’s Falls. “These improvements will provide better water services, increase firefighting capabilities.”
The project involves installing a new water line from the municipal well to the standpipe, constructing a building to house a new booster pump to increase pressure to all fire hydrants in the village, and replacing older lines to handle increased water pressure. The upgrades will provide residents and businesses with a more stable water supply.
Parry Sound’s sewage collection system upgrade will also receive federal infrastructure cash with a boost of $1,066,667.
This project requires the upgrading of the town’s sewage collection system by replacing two forcemains that cross the Seguin River, and approximately 1.4 kilometres of forcemain connecting to the wastewater treatment plant.
The federal contribution would be up to one-third of total eligible costs, estimated at $3.2 million.
“Supporting the upgrading of the sewage collection system is one of the ways we will deliver results for the residents of Parry Sound,” said Tony Clement, Parry Sound-Muskoka MP.
DCN News Services
| MOST POPULAR STORIES |
- Professional Engineers Ontario unveils new performance standards for demolition
- British Columbia’s construction unions and contractors ratify agreement on drug testing
- Digging deep at Tucker Hi-Rise’s X Condos project
- Deaths of SNC-Lavalin workers in Algeria highlight risks of overseas operations
- Toddglen Construction builds new Neighbourhood on Bloor Street
- 20 Most Popular Stories
| CURRENT STORIES |
- Lineup at the Bars in Toronto
- Industry welcomes $1.1 billion investment in infrastructure by Ontario
- Ontario Association of Architects produces client hiring guide
- Macivor moving on from Ontario industry secretariat
- Behind the Post in Etobicoke, Ontario
- Video Editorial: U.S. trade deficit remains stuck at $700 billion
- Integrated Team Solutions is the preferred proponent for Woodstock, Ontario hospital
- GO Transit wraps up Lakeshore expansion job
- Norwegian solar panel firm to build Quebec plant
- Columns installed in London Olympic stadium
| ALEX’S BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in Canada's economic environment. He also shares light-hearted reflections on life and current events.
Economics Blog More 
- Industrial Construction is Resource-related (August 28, 2008)
- Construction Starts are Down about One-quarter So Far this Year (August 22, 2008)
- Canada’s Slide in Housing Starts Begins (August 21, 2008)
Lifestyle Blog More 
- What’s Red, Pretty and Prickly? (August 26, 2008)
- What’s Happened to Jokes Isn’t Funny (August 25, 2008)
| PROJECT NEWS BRIEFS |
Updates on Canadian construction projects from Reed Construction Data’s research team. More 
- Salter Pilon Architecture Inc. wins contract to design Bradford recreation centre (Aug 22, 2008)
- Shore Tilbe Irwin & Partners begin designs for LEED Silver-compliant community centre (Aug 22, 2008)
- Salter Pilon Architecture nears completion of Georgian Manor working drawings (Aug 22, 2008)
- Town of Markham proposes new LEED-compliant Cathedral Town firehall (Aug 22, 2008)
- Townline Group plans redevelopment of former Fantasy Garden World property (Aug 18, 2008)
