LATEST NEWS
June 27, 2008
Architect Fisher’s plans for “revolving” buildings face skepticism
NEW YORK
Is it real or science fiction?
An Italian architect said he is poised to start construction on a new skyscraper in Dubai that will be “the world’s first building in motion,” an 80-storey tower with revolving floors that give it an ever-shifting shape.
The spinning floors, hung like rings around an immobile cement core, would offer residents a constantly changing view of the Persian Gulf and the city’s futuristic skyline.
A few penthouse villas would spin on command using a voice-activated computer. The motion of the rest of the building would be choreographed in patterns that could be altered over time.
Speaking at a news conference in New York on Tuesday, the building’s designer, David Fisher, declared that his tower will revolutionize the way skyscrapers are made — a claim that might strike some as excessively bold.
Fisher acknowledges that he is not well known, has never built a skyscraper before and hasn’t practised architecture regularly in decades.
But he insisted his lack of experience wouldn’t stop him from completing the project, which has attracted top design talent, including Leslie Robertson, the structural engineer for the World Trade Center and the Shanghai World Financial Centre.
“I did not design skyscrapers, but I feel ready to do so,” Fisher said.
Twisting floors are just one of several futuristic features in the building, the first of several Fisher hopes to build with a similar design.
Giant wind turbines installed between every floor, he said, will generate enough electricity to power the entire building, and lifts will allow penthouse residents to park their cars right in their apartments.
A second version of the tower, to be built in Moscow, would have a retractable helicopter pad. Both structures, at 400 metres, would be taller than the Empire State Building.
Even the method of construction would be unorthodox.
Fisher said each floor will be prefabricated in an Italian factory, then shipped to the site to be attached to the core. Assembling a building in this fashion, he said, will require only 80 technicians and take only 20 months, saving tens of millions of dollars, for a total cost of US$700 million.
On its face, the project seems to pose a number of complicated engineering puzzles.
How would the plumbing hookups work in an apartment that is constantly moving? Fisher said the pipes will connect to the core via attachments similar to the ones used by military aircraft for in-flight refuelling.
Wouldn’t people get dizzy? No, says Fisher. The rotations will be slow enough that no one will notice.
With so many moving parts, wouldn’t the building be a maintenance nightmare? Fisher said the building’s modular construction will allow easy access to parts that need to be replaced.
Robertson, who attended Tuesday’s news conference, said that the skyscraper might be unusual, but is “absolutely” buildable.
“You can build anything,” he said, smiling.
Fisher declined to say exactly where in Dubai the tower will be built or when site work might begin.
Associated Press
| MOST POPULAR STORIES |
- Four companies short-listed to renovate London, Ontario hospital
- Delcan to provide enegineering services for Highway 407 extension
- Hamilton water treatment plant stays in service during rebuilding operation
- Plenty of work ahead as Ontario construction-site safety blitz ends
- Construction, engineering companies mergers increased in Q2: Report
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 263 projects with a total value of $8,919,878,049 that Reed Construction Data Building Reports reported on yesterday.
$120,000,000 Ottawa ON Negotiated
CONDOMINIUM APARTMENT BUILDING
$120,000,000 Toronto ON Negotiated
$50,000,000 Ottawa ON Prebid
| CURRENT STORIES |
- Ground broken on Halifax RCMP headquarters
- Fanshawe College’s new Centre for Applied Transportation Technologies goes green
- Vanbots continues work on York University Life Sciences Building in Toronto
- Manitoba introduces new farm building code
- Heavy rains wash away bridges to Nova Scotia fishing village
- South Korea calls for financial safety net
- Jobsite safety a shared duty: Mechanical Contractors Association
- New technology could help find Jimmy Hoffa: Study
- Crane operator certification deadline looms in British Columbia
- High-tech oil sands project near Fort McMurray, Alberta could change industry
- Saskatoon bridge closed indefinitely over structural concerns
- City of Regina project turns up all sorts of surprises
- Awareness about qualifications-based selection lacking: Survey
- Canadian Institute of Steel Construction launches Steel Day
- Saskatchewan bridge collapses, causing crane to topple
- Crane tips over, killing worker and injuring two
- Saskatoon man pulled from hole at construction site
- Churchill airport gets government cash for infrastructure upgrades
- Stantec acquires health care architectural firm
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Canada’s construction starts in a transition phase (August 27, 2010)
- U.S. initial jobless claims rise to half a million again (August 19, 2010)
- It’s been 35 years since institutional construction starts as strong (August 6, 2010)
- More










