November 10, 2006
WILLIAM CONWAY/PROGRESS PHOTOGRAPHY
Phase one of a Regent Park redevelopment project is well under way, as REC Demolition tears down existing buildings.
Environment
LEEDing the way in Regent Park demo
Demolition makes way for community redevelopment
Achieving Gold standard in LEED at Regent Park in Toronto started with the wrecking ball, as Restoration Environmental Contractors (REC) Demolition keeps in mind the environmental concerns for the two-year project.
Don Bremner, president of Restoration Environmental Contractors REC Demolition, is well into Phase One of a two-year project to revitalize the area in cost effective, environmentally-sound manner.
The City of Toronto will spend about $1 billion for the six phase project to tear down housing which has reached the end of its 60-plus year lifespan and provide better housing for the community to rejuvenate the neighbourhood. The project is being done with a green approach.
Phase one covers the block of Gerrard, Sackville, Dundas and Parliament.
“When we bid on the project, one of the keys was to obviously be cost effective, but also be energy efficient and environmentally sensitive on the project,” said Bremner.
The entire project is focused on environmental sustainability, with a predicted reduction of 44,000 tons of carbon dioxide per year, reduction in 80 per cent of fossil fuel consumption and a maximum of 76 per cent reduction in energy consumption.
It all starts with the demolition. Bremner noted the demolition project concentrated on recycling interior cabinetry, interior wood, appliances and windows.
Brick, concrete, and structural components were crushed down and used as road beds, fill in parking lots and future staging. Salvaged metals were recycled and hauled off site. “Anything that could be reused in other areas of the project is being utilized,” added Bremner. Items from the original Regent Park that were to be reused in new construction were itemized in the tender, including most of the lighting fixtures, electronics and plumbing.
The Daniels Corporation has been selected as the Regent Park developer it will move in after REC Demolition gets the results from a final round soil testing.
“We think that it is pretty positive that there is no serious soil contamination. So far, all of the tests have come back with no contamination at all,” said Bremner. “There was a lot of criticism that the soils had been seriously contaminated. So far, that has been proven to be untrue.”
Demolition was expected to come in at 90 per cent environmentally sound. It was exceed by an extra seven per cent.
While involved in the phase one demolition, 20 per cent of the workforce employed by REC Demolition reside in the surrounding community.
A Local Employment Program offered young adults in the neighbourhood a chance to get an introduction to the construction and demolition industry.
“The entire project has been hugely successful because it has connected us with the community of Regent Park,” said Bremner.
Born from the need for social housing after the Second World War, a 1946 Regent Park project replaced “shacks” in East York with necessary community housing. In the past half-century, the community is at the end of its lifespan.
| MOST POPULAR STORIES |
- Video Editorial: U.S. trade deficit remains stuck at $700 billion
- Industry welcomes $1.1 billion investment in infrastructure by Ontario
- Brampton, Ontario mall project holds multiple challenges
- Oilsands equipment for Northern Alberta will move via Thunder Bay, Ontario
- Work proceeds at Shops At Don Mills
- 20 Most Popular Stories
| CURRENT STORIES |
- History plays a role in Niagara-on-the-Lake development
- Sawing at St. Gabriel Village in North York, Ontario
- A growing, green biodiesel option
- Guelph, Ontario firm fined $200,000 in worker's death
- Aecon wins $31.5 million Smiths Falls, Ontario hospital contract
- Video Editorial: U.S. trade deficit remains stuck at $700 billion
- Sky-high View in Vancouver
- Plutonic lands GE financial services as P3 partner in B.C. Hydro bid
- New Zealand industry finds estimators in short supply
- Rising temperatures damage infrastructure in Arctic communities
- U.S. resident dies in Alberta collision
- Quebec nuke plant to get $1.9 billion upgrade
- Moncton, New Brunswick set to replace Turtle Creek dam
| ALEX’S BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in Canada's economic environment. He also shares light-hearted reflections on life and current events.
Economics Blog More 
- Upcoming Mega Industrial Construction Projects (August 29, 2008)
- Industrial Construction is Resource-related (August 28, 2008)
- Construction Starts are Down about One-quarter So Far this Year (August 22, 2008)
Lifestyle Blog More 
- What’s Red, Pretty and Prickly? (August 26, 2008)
- What’s Happened to Jokes Isn’t Funny (August 25, 2008)
| PROJECT NEWS BRIEFS |
Updates on Canadian construction projects from Reed Construction Data’s research team. More 
- Salter Pilon Architecture Inc. wins contract to design Bradford recreation centre (Aug 22, 2008)
- Shore Tilbe Irwin & Partners begin designs for LEED Silver-compliant community centre (Aug 22, 2008)
- Salter Pilon Architecture nears completion of Georgian Manor working drawings (Aug 22, 2008)
- Town of Markham proposes new LEED-compliant Cathedral Town firehall (Aug 22, 2008)
- Townline Group plans redevelopment of former Fantasy Garden World property (Aug 18, 2008)
